Contract Date Description Amount
December/2019 Mitch Fredrick- Forked horn repairs, GHS to new chip seal area $50,973.00
June/2019 Allen Duckworth (Lowes) -Sign posts and hardware to install curve signs on GSH $41.30 $41.00
May/2019 Allen Duckworth (Lowes) 6- sign posts and 12 bolts to install Dip signs on Lone Pine, Silverado and Forked Horn $115.66 $115.00
April/2019 Kevin McCamy (Betschart Contractors) 10- Traffic cones, 2- type barricades with aluminum sign attached $150 $150.00
March/2019 Pam Fulmer (Tidwell Sign)- 2 street signs and pole brackets, Forked Horn and Prancing Deer $231.66 $231.00
2019 YTD TOTAL: $51,510.00

2018 Road Work

Contract Date Description Amount
November/2018 Mitch Fredrick- Pothole project, Impala $28,045.00
October/2018 Mitch Fredrick- Pothole project, Gunsmoke, GSH, Silverado, Peppertree and Impala- $72,449.70 $72,449.00
October/2018 Mitch Fredrick- Pothole project, Gunsmoke, GSH, Silverado and Peppertree- $28,836.24 $28,836.00
September/2018 Mitch Fredrick- Pothole repair project, Blossom, Mulberry and Impala- $ 38,293.56 $38,293.00
September/2018 Mitch Fredrick- Pothole repair project, Impala and Playdoe- $22,699.80 $22,699.00
August/2018 Mitch Fredrick- concrete swale corrosion repairs at 5590 Forked Horn $3,250.00
June/2018 Extra work per contract dated May 3, 2018. Cleaned chip seal as needed, applied an oil tack coat.Installed 360' lineal feet of asphalt machine berm type "A" dyke on North shoulder of Lone Pine Place from culvert inlet at 5621 to driveway at 5651. 360' lineal foot @ $10.50 per L.F. = $3,780. Extra work per contract dated May 23, 2018 Furnished and installed culvert extension 12" diameter x 7' long at 5760 Lone Pine Pl. to control erosion at the fence line. $300.00 Lone Pine Pl. existing chip seal/asphalt area from 5831 to 5871 and Pepper Tree south end from Lone Pine Place to 2360 Pepper Tree 10,400 sq. ft single chip seal: Cleaned areas as needed, installed and compacted 3 tons of hot mix asphalt skin patching as needed, applied an oil fog seal on all patches. Installed a single chip seal using CRS2H oil applied at a rate of .40 gallons per square yard. Installed and compacted 3/8" granite chips at a rate of 32 lbs per square yard. Furnished traffic control and signage as needed. $ 7,280.00 Total cost $ 11,360.00 $11,360.00
June/2018 Chip seal project- Completed work per RFP/contract dated January 9, 2018. Cleared and grubbed edges/swales as needed, set drainage. Ripped roads to a 3" depth minimum, added water for proper moisture content. Fine graded, watered, re-compacted existing base and sub-grade as needed to establish 20' widths*, where possible. Installed and compacted class 2 base as noted on sheets 7-13. Set grades for double chip-seal. Paved swales as needed. Installed a double chip-seal: 1st layer applied SC800 oil at .50 gallons per square yard. Installed and compacted 1/2" granite chips at a rate of 30 lbs per square yard. 2nd layer applied CRS2H oil at a rate of .40 gallons per square yard. Installed and compacted 3/8" granite chips at a rate of 32 lbs per square yard. Furnished traffic control and signage as needed. Roads completed, Lone Pine and South Peppertree. Clear, grub, sub grade, base installation and fine grade. 73,610 sq. ft @ $0.56 sq. ft. = $41,221.60 Double Chip-seal. 73,610 sq. ft. @ $0.83 sq. ft. = $ 61,096.30 Class 2 base materials and delivery. 2,383.66 tons @ $ 23.00 per ton = $ 54,824.18 Traffic control and signage. Lump sum (partial) $ 1,500.00 Culvert swale sheet #2. Lump sum $ 7,500.00 *Some areas are 18' and 16' wide. Total cost $ 166,142.08 $166,142.00
June/2018 Mitch Fredrick- Extra work on Chip Seal project, Phase 3, Lone Pine and south Pepper Tree $11,360.00
June/2018 Mitch Fredrick- Extra work on Chip Seal project, Phase 3, Lone Pine and south Pepper Tree- $27,640.84 $27,640.00
June/2018 Statewide Safety Signs- (20) 20 MPH Signs $806.52 $806.00
April/2018 Chip seal project- Completed work per RFP/contract dated January 9, 2018. Cleared and grubbed edges/swales as needed, set drainage. Ripped roads to a 3" depth minimum, added water for proper moisture content. Fine graded, watered, re-compacted existing base and sub-grade as needed to establish 20' widths*, where possible. Installed and compacted class 2 base as noted on sheets 7-13. Set grades for double chip-seal. Paved swales as needed. Installed a double chip-seal: 1st layer applied SC800 oil at .50 gallons per square yard. Installed and compacted 1/2" granite chips at a rate of 30 lbs per square yard. 2nd layer applied CRS2H oil at a rate of .40 gallons per square yard. Installed and compacted 3/8" granite chips at a rate of 32 lbs per square yard. Furnished traffic control and signage as needed. Roads completed, Whitetail and Morning Star. Clear, grub, sub grade, base installation and fine grade. 92,581 sq. ft @ $0.56 sq. ft. = $51,845.36 Double Chip-seal. 92,851 sq. ft. @ $0.83 sq. ft. = $ 76,842.23 Class 2 base materials and delivery. 2,034.59 tons @ $23.00 per ton = $ 46,795.57 Traffic control and signage. Lump sum (partial) $ 1,500.00 Culvert per proposal 04/05/2018 Lump sum $ 2,375.00 This completes the first half of phase #3. *Some areas are 18' and 16' wide. Total cost $ 179,358.16 $179,358.00
February/2018 Statewide Safety Signs- Slow Curve, Slow Dip, Deliminators $1903.70 $1,903.00
2018 YTD TOTAL: $592,141.00

2017 Road Work

Contract Date Description Amount
December/2017 Chip Seal Project first 1/2 phase 2- Completed work per RFP/contract dated October 10, 2017. Cleared and grubbed edges/swales as needed, set drainage. Ripped roads to a 3" depth minimum, added water for property moisture content. Fine graded, watered, re-compacted existing base and sub-grade as needed to establish 20' widths. Installed and compacted 4"-6" of class 2 base as needed in various areas. Set grades for double chipseal. Installed a double chipseal: 1st layer applied SC800 oil at .50 gallons per square yard. Installed and compacted 1/2" granite chips at a rate of 30 lbs per square yard. 2nd layer applied CRS2H oil at a rate of .40 gallons per square yard. Installed and compacted 3/8" granite chips at a rate of 32 lbs per square yard. Furnished traffic control and signage as needed. Roads completed: North Peppertree. west end Silverado and Prancing Deer. Clear, grub, subgrade, base installation and final grade. 78,281 sq. ft. @ $ 0.58 sq. ft. = $ 45,402.98 Double chip-seal, 78,281 sq. ft @ $ 0.90 sq. ft. = $ 70,452.90 Class 2 base materials and delivery. 2,507.85 tons @ $24.50 per ton = $ 61,442 Traffic control and signage Lump sum (partial) $ 2,000 Concrete swale sheet #6 Lump Sum $ 7,500 Culvert sheet #9 Lump sum $ 5,900 Culvert sheet # 11 Lump sum $ 4,950 This is just over 1/2 Phase #2 completed. Total cost $ 197,648.21 $197,648.00
November/2017 Chip Seal Project- Completed work per RFP/contract dated August 9, 2017. Cleared and grubbed edges/swales as needed, set drainage. Ripped roads to a 3" depth minimum, added water for proper moisture content. Fine graded watered, re-compacted existing base and sub-graded as needed to establish 20' widths. Installed and compacted 4"-6" of class 2 base* as needed in various areas. Set grades for double chip-seal. Installed a double chip-seal: 1st layer applied SC800 oil at .50 gallons per square yard. Installed and compacted 1/2" granite chips at a rate of 30 lbs per square yard. 2nd layer applied CRS2H oil at a rate of .40 gallons per square yard. Installed and compacted 3/8" granite chips at a rate of 32 lbs per square yard. Furnished traffic control and signage as needed. Roads completed, Forked Horn west end asphalt to asphalt on East and Winchester. Clear, grub, sub-grade, base installation and fine grade. 49,100 sq. ft. @ $1.44 sq. ft. = $ 70,704.00 Double chip-seal 49,100 sq. ft. @ $ 0.86 sq. ft. = $ 42,226.00 Traffic control and signage. Lump sum (partial) $ 2,500 Concrete swale. Lump sum $ 8,500 Asphalt materials for down drain. 6.0 tons @ $ 100 per ton = $600.00 *This section called for 1,575 tons of class 2 base, only 1,423 tons was needed/used so a credit for unused materials and delivery on 152 tons @ $ 24.00 per ton allowed. Phase #1 is complete. Total due $ 120,882.00 $120,882.00
November/2017 Associated traffic safety- 2 blank signs $56.25 $56.00
September/2017 Chip Seal Project- Mitch Fredrick Completed work per RFP/contract dated August 9, 2017. Cleared and grubbed edges/swales as needed, set drainage. Ripped roads to a 3" depth minimum, added water for proper moisture content. Fine graded, watered, re-compacted existing base and sub-grade as needed to establish 20' widths. Installed and compacted *class 2 base as needed in various areas. Set grades for double chipseal. (Blacktail, Buck Way and western end of Forked Horn had 6" of existing base). Installed a double chipseal: 1st layer applied SC800 oil at .50 gallons per square yard. Installed and compacted 1/2" granite chips at a rate of 30 lbs per square yard. 2nd layer applied CRS2H oil at a rate of .40 gallons per square yard. Installed and compacted 3/8" granite chips at a rate of 32 lbs per square yard. Furnished traffic control and signage as needed. Roads completed, Blacktail, Buck Way and Forked Horn west end to asphalt on East. Clear, grub, sub grade, base installation and fine grade.101,300 sq. ft @ $1.44 sq. ft. = $145,872.00 Double Chipseal 101,300 sq. ft. @ $0.84 sq. ft. = $ 87,118.00 Traffic control and signage. Lump sum (partial) $ 3,500.00 *This section called for 2,775 tons of class 2 base, only 820 tons was needed/used so a credit for unused materials and delivery on 1,955 tons @ $24.00 per ton allowed. Total due $189,570.00 $189,570.00
May/2017 Mark Switzer Excavating- Lower phone lines to install culvert $775.00
May/2017 Mark Switzer Excavating- Pepper Tree hill paving project $43,129.00
April/2017 Mitch Fredrick- Silverado, Lone Pine, Prancing Deer- Power wash culverts and rebuild shoulders and compact. $21,200.00
April/2017 Mitch Fredrick- Forked Horn paving project $27,263.00
April/2017 Mitch Fredrick- Morningstar emergency repairs $7,750.00
March/2017 Kritz- Rock stockpile for repairs $241.31 $241.00
February/2017 MTM- Morning Star 2 culverts $12,000.00
January/2017 Mitch Fredrick- DG Stockpile for repairs $475.00
2017 YTD TOTAL: $620,989.00

2016 Road Work

Contract Date Description Amount
February/2016 Lone Pine $850.00
February/2016 Forked Horn $9,950.00
February/2016 Peppertree/Forked Horn $1,265.00
2016 YTD TOTAL: $12,065.00

2015 Road Work

Contract Date Description Amount
October/2015 Various roads $12,092.00
October/2015 Peppertree, Silverado $3,460.00
October/2015 Silverado $450.00
August/2015 Peppertree Hill $10,025.00
May/2015 Peppertree $730.00
2015 YTD TOTAL: $26,757.00

2014 Road Work

Contract Date Description Amount
April/2014 Maintenance base roads included 900 tons of Class II base, 80 yards of red rock base; rip, grade, compact set and grade clean. Road work will be furnished on the sections of the following roads. -Between Lone Pine & Geneseo to GSH (address 5820-5831) add 75 tons of subbase. -Silverado from Geneseo to GSH added 400 tons of base throughout the whole road. - Morning Star from GSH to Maverick added 425 tons of subbase throughout the whole road. - Pepper Tree from Geneseo to Prancing Deer. At Pepper Tree Hill (at Silverado 340 ft. N of culvert) add 80 ton of red rock base material. - Prancing Deer from 5714 until end of road. -Winchester from GSH until end of road. - Blacktail entire road. - Buck Way entire road. - Forked Horn from approx 5520 to end of based road as well as between 5695 and top of hill. $106,087.00
February/2014 Emergency work - Silverado $350.00
February/2014 Encroachment work $16,930.00
January/2014 Emergency work - various roads $2,375.00
2014 YTD TOTAL: $125,742.00

2013 Road Work

Contract Date Description Amount
August/2013 Chip Seal White Tail, Prancing Deer, Stagg Hill $69,247.00
March/2013 Drainage Work - Silverado $5,740.00
January/2013 Emergency Work - Culverts $1,500.00
2013 YTD TOTAL: $76,487.00

2012 Road Work

Contract Date Description Amount
August/2012 Based Roads - Forked Horn, Buck Way, Black Tail, Morning Star, White Tail, Lone Pine, Silverado, Peppertree, Prancing Deer $37,572.00
March/2012 Emergency Work - Culverts $1,100.00
March/2012 Emergency Work - Morning Star $2,250.00
January/2012 A/C Playdoe from GSH to Maverick, Maverick from Playdoe to White Tail $43,806.00
2012 YTD TOTAL: $84,728.00

2011 Road Work

Contract Date Description Amount
August/2011 Culverts $5,140.00
August/2011 Based Roads - Morning Star, Lone Pine, Silverado, Forked Horn, Blacktail $8,900.00
August/2011 A/C Patch of various roads $22,165.00
April/2011 A/C, Chip, DG $36,917.00
April/2011 A/C - GSH $32,765.00
March/2011 Emergency Work - Forked Horn $2,500.00
2011 YTD TOTAL: $108,387.00

2010 Road Work

Contract Date Description Amount
August/2010 Emergency Repairs - Impala & Playdoe $1,000.00
August/2010 AC Work - Playdoe $17,480.00
August/2010 AC Work - White Tail $2,100.00
August/2010 AC Work - Stag Hill $2,100.00
August/2010 AC Work - Ground Squirrel Hollow $6,075.00
August/2010 AC Work - Prancing Deer $2,240.00
May/2010 DG Work - Winchester $400.00
May/2010 DG Work - Forked Horn $8,775.00
May/2010 DG Work - Prancing Deer $7,475.00
May/2010 DG Work - Silverado $9,350.00
May/2010 DG Work - Lone Pine $9,175.00
May/2010 DG Work - Morning Star $8,775.00
May/2010 DG Work - Black Tail $2,750.00
May/2010 DG Work - Buck Way $1,750.00
May/2010 DG Work - White Tail Place & Pepper Tree $8,450.00
March/2010 DG Work - Stag Hill $525.00
January/2010 Emergency Work - DG Stockpile $425.00
2010 YTD TOTAL: $88,845.00

2009 Road Work

Contract Date Description Amount
December/2009 Emergency Road Repairs - Silverado Place $3,500.00
May/2009 Various Road Repairs - Ground Squirrel Hollow Road - Reach #2 $16,429.00
May/2009 Various Road Repairs - Ground Squirrel Hollow Road - Reach #1 $22,386.00
May/2009 Various Road Repairs - Mulberry Lane $23,741.00
May/2009 Various Road Repairs - Blossom Lane $8,798.00
February/2009 Emergency Road Repairs - Forked Horn $12,333.00
2009 YTD TOTAL: $87,187.00

2008 Road Work

Contract Date Description Amount
July/2008 Various Road Repairs - Lone Pine Road $4,987.00
May/2008 Various Road Repairs - Clean up base on Peppertree from Prancing Deer to Geneseo. Rip, water, grade and re-compact. From 2190 Peppertree - up hill (North), add 25 tons of sub-base. $4,425.00
May/2008 Various Road Repairs - Clean up base on Silverado. From Geneseo to GSH, Rip, water, grade and re-compact with roller. Clean shoulder for proper drainage. From 5851 to 5828 Silverado add 25 tons of sub-base. At 5660 add another 25 tons of sub-base. Grade water and compact. $10,010.00
March/2008 Various Road Repairs - Clean up base on Lone Pine from Geneseo to GSH. Rip, water, grade and re-compact with roller. Clean up shoulder for proper drainage. From Geneseo to Peppertree, add 12 tons of sub-base. From Peppertree to 5691 Lone Pine, add 363 tons of sub-base. From 5660 Lone Pine to GSH add 25 tons of sub-base. $17,040.00
March/2008 Various Road Repairs - Clean up base on Morning Star from GSH to Maverick. Rip, water, grade and re-compact with roller. Clean up shoulder for proper drainage. From GSH to 5531 Morning Star, add 50 tons of sub-base. From 5531 to 5350 Morning Star, add 150 tons of sub-base. $11,560.00
March/2008 Various Road Repairs - Clean up base on Prancing Deer from pavement end to end. Rip, water, grade and re-compact with roller. From pavement end to the bottom of the hill at Peppertree, add 200 tons of sub-base. From Peppertree to end of Prancing Deer, add 50 tons of sub-base where needed. $11,350.00
March/2008 Various Road Repairs - From 5525 Forked Horn to West 5850 Forked Horn - Rip, water, and re-compact with roller. Clean the shoulder for proper drainage. Add 150 tons of sub-base where it is needed. $9,160.00
2008 YTD TOTAL: $68,532.00

2007 Road Work

Contract Date Description Amount
January/2007 Various Road Repairs - Playdoe Road from Ground Squirrel Hollow to Maverick Road - Sweep/Clean road surfaces and potholes as needed, apply an oil tack coat on areas to be patched, install/compact hot mix asphalt (Approx 5 tons). $2,260.00
January/2007 Various Road Repairs - Ground Squirrel Hollow from Playdoe Road to Forked Horn - Sweep/Clean road surfaces and potholes as needed, apply an oil tack coat on areas to be patched, install/compact hot mix asphalt (Approx 15 tons) $4,050.00
January/2007 Various Road Repairs - Ground Squirrel Hollow from Geneseo Road to Playdoe Road - Sweep/Clean road surfaces and potholes as needed, apply an oil tack coat on areas to be patched, install/compact hot mix asphalt (Approx 100 tons). $14,100.00
January/2007 Emergency Road Repair - Pepper Tree Way - Base Work 3,200 sq. ft. (400 x 8) - Furnish/deliver and install/compact 6 inches of Windsor Red Rock base material 8 foot wide from Silverado Road to bottom of hill. $3,850.00
January/2007 Emergency Road Repair - Pepper Tree Way - Base Work 4,800 sq. ft. (400 x 12)- Furnish/deliver and install/compact 6 inches of Windsor Red Rock base material 12 foot wide from Silverado Road to bottom of hill. $6,575.00
January/2007 Emergency Road Repair - Pepper Tree Way - Sub Grade Work - Cut sub grade on road surface to establish proper drainage, cut/fill road surface to establish a 20 foot width with drainage swales down each side (dependent on phone line placement), set grades for placement of 6 inches of Windsor Red Rock base material. $3,400.00
2007 YTD TOTAL: $34,235.00

2006 Road Work

Contract Date Description Amount
December/2006 Morningstar - From Ground Squirrel Hollow to 5350 Morningstar - Clean up shoulder, crown, and slope where needed for proper drainage, add approx 1,450 tons of Rocky Canyon sub-base (approx 4"), and water/compact $0.00
December/2006 5673-5680 Forked Horn - Remove debris form plugged culvert, furnish and install 40 feet of new 18' culvert, add approx 50 tons Rocky Canyon sub-base to cover culvert and correct drainage. $0.00
December/2006 Pepper Tree - Clean up base from Silverado to Lone Pine, cut in shoulder, add approx 400 tons of Rocky Canyon sub-base (approx 4"), and water/compact $0.00
October/2006 White Tail Place - Rip/Water/Re-compact, add approx 130 tons of Class II base, recrown, re-compact w/roller, clean up shoulders from top of hill to 30' past pole. $7,000.00
October/2006 5671-5660 Lone Pine - 280'x21' of road from block wall to bottom of hill- Remove existing A/C, re-grade and sheet to the right side - looking up the hill, pave 2 1/2" compacted - 3/4" aggregate, burm on right side from top of hill to driveway, pave swell across approach, backfill and compact shoulder (approx 90 tons A/C and approx 129 tons base at 4" thick) $20,490.00
October/2006 GSH from Forked Horn to Gunsmoke - Sweep/Blow/Clean 18'x920' road, clean up shoulders on both sides, Sweep/Clean/Tack oil/Skin Patch (approx 75 tons of A/C 3/8" aggregate). $10,974.00
October/2006 Gunsmoke/GSH - Sweep/Clean/Tack oil/Skin Patch 3/8" aggregate on GSH to Power Pole (approx 20tons of A/C), clean up right shoulder going up hill and use dirt on left side to fill in trench, water and compact. $4,480.00
October/2006 6005 Silverado - 20'x400' of approx 176 tons Class II base (approx 4") positive flow across road at corner, clean up shoulder. $7,765.00
October/2006 5825 Silverado - Furnish & Install one 18" diameter x 25' long steel culvert pipe, install & compact 75 tons of Class II base, install rip rap rock over culvert at inlet/outlet. $4,795.00
April/2006 Various - Asphalt Repairs to potholes and extreme broken edges, cleana areas to be patched, install/compact 15 tons of 3/8" hot mix asphalt patching. $3,825.00
January/2006 Impala to end of road - Sweep/Clean/Tack Oil Thin Skim hot patch 3/8" aggregate, Play Doe to top of hill 18/tons, to top of ridge 25/tons $7,720.00
January/2006 Stagg Hill to end of pavement - Sweep/Clean/Tack Oil asphalt patch $675.00
January/2006 Maverick from White Tail to end of pavement - Sweep/Clean/Tack Oil asphalt patch $675.00
January/2006 Play Doe to Maverick - Sweep/Clean/Tack Oil asphalt patch $475.00
January/2006 Prancing Deer to end of pavement - Sweep/Clean/Tack Oil asphalt patch $2,250.00
2006 YTD TOTAL: $71,124.00

2005 Road Work

Contract Date Description Amount
December/2005 Ground Squirel Hollow from Prancing Deer to Forked Horn - Sweep/Clean/Tack Oil asphalt patch, approx 12 points $925.00
December/2005 Ground Squirel Hollow from Lone Pine to Prancing Deer - Sweep/Clean/Tack Oil asphalt patch, approx 28 points $1,750.00
December/2005 Ground Squirel Hollow to Lone Pine - Sweep/Clean/Tack Oil asphalt patch, approx 18 points $1,325.00
December/2005 Siverado at Geneseo - Grade/ Shape/ Add 100 tons of DG base material, as needed. $5,755.00
October/2005 Lone Pine - Grade/ Shape/ Add 100 tons of DG base material to Lone Pine,beginning at Ground Squirrel Hollow, transition from asphalt to 5660 Lone Pine ,and from 5671 Lone Pine to 5960 Lone Pine $11,493.00
August/2005 Forked Horn from Ground Squirrel Hollow to top of hill -Sweep / Clean / Tack Oil / Asphalt Patch 22 tons. $4,800.00
August/2005 Maverick from Play Doe to White Tail - Sweep / Clean / Tack Oil / Asphalt Patch 5 tons on Maverick. $1,150.00
August/2005 Play Doe from Ground Squirrel Hollow to Maverick - Sweep / Clean / Tack Oil /Asphalt Patch 17 tons. $4,250.00
August/2005 Ground Squirrel Hollow from Play Doe to Geneseo - Sweep / Clean / Tack Oil / Asphalt Patch 10 tons (holes only not edges). $3,150.00
August/2005 Ground Squirrel Hollow from Forked Horn to Play Doe - Sweep / Clean / Tack Oil / Asphalt Patch 12 tons. $2,450.00
March/2005 Ground Squirrel Hollow from Geneseo to Silverado - Grade road edges to remove overburden material, power sweep and clean road surface, apply an oil tack coat where needed, install/compact 125 tons of "hot" mix asphalt patching to pot hole and road edges out to a maximum width of 18 feet. $13,950.00
February/2005 Pepper Tree - Grade existing road (to improve drainage), install approx 100 tons DG base, compact. $3,440.00
February/2005 Silverado - Remove existing culvert, furnish/install 2 - 18" diameter x 25' HDPE culvert pipes, repair road, install approx 25 tons of DG, furnish/install 2 - 18" diameter x 20' culvert pipes at driveway. $2,950.00
February/2005 Forked Horn - Grade road from chipseal section to end (to improve drainage) ,install approx 200 tons of DG base on hill slopes as necessary, compact. $6,280.00
2005 YTD TOTAL: $63,668.00

GROUND SQUIRREL HOLLOW CSD Recap of Contracted Road Repairs

Summary Amount
2019 Sub-Total $51,510.00
2018 Sub-Total $592,141.00
2017 Sub-Total $620,989.00
2016 Sub-Total $12,065.00
2015 Sub-Total $26,757.00
2014 Sub-Total $125,742.00
2013 Sub-Total $76,487.00
2012 Sub-Total $84,728.00
2011 Sub-Total $108,387.00
2010 Sub-Total $88,845.00
2009 Sub-Total $87,187.00
2008 Sub-Total $68,532.00
2007 Sub-Total $34,235.00
2006 Sub-Total $71,124.00
2005 Sub-Total $63,668.00
Grand Total $2,112,397.00