Road Work

2016 Road Work

Contract Date Description Amount
February/2016 Lone Pine $850.00
February/2016 Forked Horn $9,950.00
February/2016 Peppertree/Forked Horn $1,265.00
2016 YTD TOTAL: $12,065.00

2015 Road Work

Contract Date Description Amount
October/2015 Various roads $12,092.00
October/2015 Peppertree, Silverado $3,460.00
October/2015 Silverado $450.00
August/2015 Peppertree Hill $10,025.00
May/2015 Peppertree $730.00
2015 YTD TOTAL: $26,757.00

2014 Road Work

Contract Date Description Amount
April/2014 Maintenance base roads included 900 tons of Class II base, 80 yards of red rock base; rip, grade, compact set and grade clean. Road work will be furnished on the sections of the following roads. -Between Lone Pine & Geneseo to GSH (address 5820-5831) add 75 tons of subbase. -Silverado from Geneseo to GSH added 400 tons of base throughout the whole road. - Morning Star from GSH to Maverick added 425 tons of subbase throughout the whole road. - Pepper Tree from Geneseo to Prancing Deer. At Pepper Tree Hill (at Silverado 340 ft. N of culvert) add 80 ton of red rock base material. - Prancing Deer from 5714 until end of road. -Winchester from GSH until end of road. - Blacktail entire road. - Buck Way entire road. - Forked Horn from approx 5520 to end of based road as well as between 5695 and top of hill. $106,087.00
February/2014 Emergency work - Silverado $350.00
February/2014 Encroachment work $16,930.00
January/2014 Emergency work - various roads $2,375.00
2014 YTD TOTAL: $125,742.00

2013 Road Work

Contract Date Description Amount
August/2013 Chip Seal White Tail, Prancing Deer, Stagg Hill $69,247.00
March/2013 Drainage Work - Silverado $5,740.00
January/2013 Emergency Work - Culverts $1,500.00
2013 YTD TOTAL: $76,487.00

2012 Road Work

Contract Date Description Amount
August/2012 Based Roads - Forked Horn, Buck Way, Black Tail, Morning Star, White Tail, Lone Pine, Silverado, Peppertree, Prancing Deer $37,572.00
March/2012 Emergency Work - Culverts $1,100.00
March/2012 Emergency Work - Morning Star $2,250.00
January/2012 A/C Playdoe from GSH to Maverick, Maverick from Playdoe to White Tail $43,806.00
2012 YTD TOTAL: $84,728.00

2011 Road Work

Contract Date Description Amount
August/2011 Culverts $5,140.00
August/2011 Based Roads - Morning Star, Lone Pine, Silverado, Forked Horn, Blacktail $8,900.00
August/2011 A/C Patch of various roads $22,165.00
April/2011 A/C, Chip, DG $36,917.00
April/2011 A/C - GSH $32,765.00
March/2011 Emergency Work - Forked Horn $2,500.00
2011 YTD TOTAL: $108,387.00

2010 Road Work

Contract Date Description Amount
August/2010 Emergency Repairs - Impala & Playdoe $1,000.00
August/2010 AC Work - Playdoe $17,480.00
August/2010 AC Work - White Tail $2,100.00
August/2010 AC Work - Stag Hill $2,100.00
August/2010 AC Work - Ground Squirrel Hollow $6,075.00
August/2010 AC Work - Prancing Deer $2,240.00
May/2010 DG Work - Winchester $400.00
May/2010 DG Work - Forked Horn $8,775.00
May/2010 DG Work - Prancing Deer $7,475.00
May/2010 DG Work - Silverado $9,350.00
May/2010 DG Work - Lone Pine $9,175.00
May/2010 DG Work - Morning Star $8,775.00
May/2010 DG Work - Black Tail $2,750.00
May/2010 DG Work - Buck Way $1,750.00
May/2010 DG Work - White Tail Place & Pepper Tree $8,450.00
March/2010 DG Work - Stag Hill $525.00
January/2010 Emergency Work - DG Stockpile $425.00
2010 YTD TOTAL: $88,845.00

2009 Road Work

Contract Date Description Amount
December/2009 Emergency Road Repairs - Silverado Place $3,500.00
May/2009 Various Road Repairs - Ground Squirrel Hollow Road - Reach #2 $16,429.00
May/2009 Various Road Repairs - Ground Squirrel Hollow Road - Reach #1 $22,386.00
May/2009 Various Road Repairs - Mulberry Lane $23,741.00
May/2009 Various Road Repairs - Blossom Lane $8,798.00
February/2009 Emergency Road Repairs - Forked Horn $12,333.00
2009 YTD TOTAL: $87,187.00

2008 Road Work

Contract Date Description Amount
July/2008 Various Road Repairs - Lone Pine Road $4,987.00
May/2008 Various Road Repairs - Clean up base on Peppertree from Prancing Deer to Geneseo. Rip, water, grade and re-compact. From 2190 Peppertree - up hill (North), add 25 tons of sub-base. $4,425.00
May/2008 Various Road Repairs - Clean up base on Silverado. From Geneseo to GSH, Rip, water, grade and re-compact with roller. Clean shoulder for proper drainage. From 5851 to 5828 Silverado add 25 tons of sub-base. At 5660 add another 25 tons of sub-base. Grade water and compact. $10,010.00
March/2008 Various Road Repairs - Clean up base on Lone Pine from Geneseo to GSH. Rip, water, grade and re-compact with roller. Clean up shoulder for proper drainage. From Geneseo to Peppertree, add 12 tons of sub-base. From Peppertree to 5691 Lone Pine, add 363 tons of sub-base. From 5660 Lone Pine to GSH add 25 tons of sub-base. $17,040.00
March/2008 Various Road Repairs - Clean up base on Morning Star from GSH to Maverick. Rip, water, grade and re-compact with roller. Clean up shoulder for proper drainage. From GSH to 5531 Morning Star, add 50 tons of sub-base. From 5531 to 5350 Morning Star, add 150 tons of sub-base. $11,560.00
March/2008 Various Road Repairs - Clean up base on Prancing Deer from pavement end to end. Rip, water, grade and re-compact with roller. From pavement end to the bottom of the hill at Peppertree, add 200 tons of sub-base. From Peppertree to end of Prancing Deer, add 50 tons of sub-base where needed. $11,350.00
March/2008 Various Road Repairs - From 5525 Forked Horn to West 5850 Forked Horn - Rip, water, and re-compact with roller. Clean the shoulder for proper drainage. Add 150 tons of sub-base where it is needed. $9,160.00
2008 YTD TOTAL: $68,532.00

2007 Road Work

Contract Date Description Amount
January/2007 Various Road Repairs - Playdoe Road from Ground Squirrel Hollow to Maverick Road - Sweep/Clean road surfaces and potholes as needed, apply an oil tack coat on areas to be patched, install/compact hot mix asphalt (Approx 5 tons). $2,260.00
January/2007 Various Road Repairs - Ground Squirrel Hollow from Playdoe Road to Forked Horn - Sweep/Clean road surfaces and potholes as needed, apply an oil tack coat on areas to be patched, install/compact hot mix asphalt (Approx 15 tons) $4,050.00
January/2007 Various Road Repairs - Ground Squirrel Hollow from Geneseo Road to Playdoe Road - Sweep/Clean road surfaces and potholes as needed, apply an oil tack coat on areas to be patched, install/compact hot mix asphalt (Approx 100 tons). $14,100.00
January/2007 Emergency Road Repair - Pepper Tree Way - Base Work 3,200 sq. ft. (400 x 8) - Furnish/deliver and install/compact 6 inches of Windsor Red Rock base material 8 foot wide from Silverado Road to bottom of hill. $3,850.00
January/2007 Emergency Road Repair - Pepper Tree Way - Base Work 4,800 sq. ft. (400 x 12)- Furnish/deliver and install/compact 6 inches of Windsor Red Rock base material 12 foot wide from Silverado Road to bottom of hill. $6,575.00
January/2007 Emergency Road Repair - Pepper Tree Way - Sub Grade Work - Cut sub grade on road surface to establish proper drainage, cut/fill road surface to establish a 20 foot width with drainage swales down each side (dependent on phone line placement), set grades for placement of 6 inches of Windsor Red Rock base material. $3,400.00
2007 YTD TOTAL: $34,235.00

2006 Road Work

Contract Date Description Amount
December/2006 Morningstar - From Ground Squirrel Hollow to 5350 Morningstar - Clean up shoulder, crown, and slope where needed for proper drainage, add approx 1,450 tons of Rocky Canyon sub-base (approx 4"), and water/compact $0.00
December/2006 5673-5680 Forked Horn - Remove debris form plugged culvert, furnish and install 40 feet of new 18' culvert, add approx 50 tons Rocky Canyon sub-base to cover culvert and correct drainage. $0.00
December/2006 Pepper Tree - Clean up base from Silverado to Lone Pine, cut in shoulder, add approx 400 tons of Rocky Canyon sub-base (approx 4"), and water/compact $0.00
October/2006 White Tail Place - Rip/Water/Re-compact, add approx 130 tons of Class II base, recrown, re-compact w/roller, clean up shoulders from top of hill to 30' past pole. $7,000.00
October/2006 5671-5660 Lone Pine - 280'x21' of road from block wall to bottom of hill- Remove existing A/C, re-grade and sheet to the right side - looking up the hill, pave 2 1/2" compacted - 3/4" aggregate, burm on right side from top of hill to driveway, pave swell across approach, backfill and compact shoulder (approx 90 tons A/C and approx 129 tons base at 4" thick) $20,490.00
October/2006 GSH from Forked Horn to Gunsmoke - Sweep/Blow/Clean 18'x920' road, clean up shoulders on both sides, Sweep/Clean/Tack oil/Skin Patch (approx 75 tons of A/C 3/8" aggregate). $10,974.00
October/2006 Gunsmoke/GSH - Sweep/Clean/Tack oil/Skin Patch 3/8" aggregate on GSH to Power Pole (approx 20tons of A/C), clean up right shoulder going up hill and use dirt on left side to fill in trench, water and compact. $4,480.00
October/2006 6005 Silverado - 20'x400' of approx 176 tons Class II base (approx 4") positive flow across road at corner, clean up shoulder. $7,765.00
October/2006 5825 Silverado - Furnish & Install one 18" diameter x 25' long steel culvert pipe, install & compact 75 tons of Class II base, install rip rap rock over culvert at inlet/outlet. $4,795.00
April/2006 Various - Asphalt Repairs to potholes and extreme broken edges, cleana areas to be patched, install/compact 15 tons of 3/8" hot mix asphalt patching. $3,825.00
January/2006 Impala to end of road - Sweep/Clean/Tack Oil Thin Skim hot patch 3/8" aggregate, Play Doe to top of hill 18/tons, to top of ridge 25/tons $7,720.00
January/2006 Stagg Hill to end of pavement - Sweep/Clean/Tack Oil asphalt patch $675.00
January/2006 Maverick from White Tail to end of pavement - Sweep/Clean/Tack Oil asphalt patch $675.00
January/2006 Play Doe to Maverick - Sweep/Clean/Tack Oil asphalt patch $475.00
January/2006 Prancing Deer to end of pavement - Sweep/Clean/Tack Oil asphalt patch $2,250.00
2006 YTD TOTAL: $71,124.00

2005 Road Work

Contract Date Description Amount
December/2005 Ground Squirel Hollow from Prancing Deer to Forked Horn - Sweep/Clean/Tack Oil asphalt patch, approx 12 points $925.00
December/2005 Ground Squirel Hollow from Lone Pine to Prancing Deer - Sweep/Clean/Tack Oil asphalt patch, approx 28 points $1,750.00
December/2005 Ground Squirel Hollow to Lone Pine - Sweep/Clean/Tack Oil asphalt patch, approx 18 points $1,325.00
December/2005 Siverado at Geneseo - Grade/ Shape/ Add 100 tons of DG base material, as needed. $5,755.00
October/2005 Lone Pine - Grade/ Shape/ Add 100 tons of DG base material to Lone Pine,beginning at Ground Squirrel Hollow, transition from asphalt to 5660 Lone Pine ,and from 5671 Lone Pine to 5960 Lone Pine $11,493.00
August/2005 Forked Horn from Ground Squirrel Hollow to top of hill -Sweep / Clean / Tack Oil / Asphalt Patch 22 tons. $4,800.00
August/2005 Maverick from Play Doe to White Tail - Sweep / Clean / Tack Oil / Asphalt Patch 5 tons on Maverick. $1,150.00
August/2005 Play Doe from Ground Squirrel Hollow to Maverick - Sweep / Clean / Tack Oil /Asphalt Patch 17 tons. $4,250.00
August/2005 Ground Squirrel Hollow from Play Doe to Geneseo - Sweep / Clean / Tack Oil / Asphalt Patch 10 tons (holes only not edges). $3,150.00
August/2005 Ground Squirrel Hollow from Forked Horn to Play Doe - Sweep / Clean / Tack Oil / Asphalt Patch 12 tons. $2,450.00
March/2005 Ground Squirrel Hollow from Geneseo to Silverado - Grade road edges to remove overburden material, power sweep and clean road surface, apply an oil tack coat where needed, install/compact 125 tons of "hot" mix asphalt patching to pot hole and road edges out to a maximum width of 18 feet. $13,950.00
February/2005 Pepper Tree - Grade existing road (to improve drainage), install approx 100 tons DG base, compact. $3,440.00
February/2005 Silverado - Remove existing culvert, furnish/install 2 - 18" diameter x 25' HDPE culvert pipes, repair road, install approx 25 tons of DG, furnish/install 2 - 18" diameter x 20' culvert pipes at driveway. $2,950.00
February/2005 Forked Horn - Grade road from chipseal section to end (to improve drainage) ,install approx 200 tons of DG base on hill slopes as necessary, compact. $6,280.00
2005 YTD TOTAL: $63,668.00

GROUND SQUIRREL HOLLOW CSD Recap of Contracted Road Repairs

Summary Amount
2016 Sub-Total $12,065.00
2015 Sub-Total $26,757.00
2014 Sub-Total $125,742.00
2013 Sub-Total $76,487.00
2012 Sub-Total $84,728.00
2011 Sub-Total $108,387.00
2010 Sub-Total $88,845.00
2009 Sub-Total $87,187.00
2008 Sub-Total $68,532.00
2007 Sub-Total $34,235.00
2006 Sub-Total $71,124.00
2005 Sub-Total $63,668.00
Grand Total $847,757.00