This page provides a yearly summary of road repairs and maintenance projects, including contract dates, brief descriptions of the work performed, and associated costs. Use the tabs above to view records from previous years.
Contract Date | Description | Amount |
---|---|---|
November/2024 | Reimbursement to Pres. McCamy for signs and hardware from Associated Traffic Safety | $233.00 |
August/2024 | Mitch Frederick Paving - Ground Squirrel Hollow/Gunsmoke Project | $76,780.00 |
August/2024 | Mitch Frederick Paving - Pothole Repair Project | $111,777.00 |
2024 YTD TOTAL: | $188,790.00 |
Contract Date | Description | Amount |
---|---|---|
December/2023 | Reimbursement to Pres. McCamy for street signs and hardware from Associated Traffic Safety. | $331.00 |
October/2023 | Mitch Frederick Paving - Mulberry Lane repair work. | $38,782.00 |
April/2023 | MTM Construction - More cleanup of mudslide debris on Ground Squirrel Hollow Road. | $1,405.00 |
January/2023 | MTM Construction - Clear debris from mud slide on Ground Squirrel Hollow. | $988.00 |
2023 YTD TOTAL: | $41,506.00 |
Contract Date | Description | Amount |
---|---|---|
November/2022 | MTM Construction - Work to clear drain and culvert on Stagg Hill. | $908.00 |
September/2022 | Mitch Frederick Paving - Project to construct repairs to Play Doe, Impala, Maverick, Stagg Hill, and White Tail. | $53,768.00 |
August/2022 | Mitch Frederick Paving - Completion of project to repair Gazelle and Rein Deer. | $37,800.00 |
August/2022 | Reimbursement to Pres. McCamy for street name signs and hardware from Associated Traffic Safety. | $155.00 |
July/2022 | Mitch Frederick Paving - Repairs to Gazelle and Rein Deer. | $27,460.00 |
May/2022 | MTM Construction - Extended two 18" culverts at 5680 Forked Horn. | $4,251.00 |
March/2022 | Reimbursement to Pres. McCamy for a sign post from Home Depot. | $38.00 |
2022 YTD TOTAL: | $124,380.00 |
Contract Date | Description | Amount |
---|---|---|
November/2021 | Reimbursement to Pres. McCamy for street name and traffic safety signs and hardware from Associated Traffic and Safety. | $200.00 |
August/2021 | Mitch Frederick Paving - Repairs at Maverick and Morning Star. | $10,932.00 |
July/2021 | Mitch Frederick Paving - Speed bumps and signs, Lone Pine and Pepper Tree. | $3,500.00 |
February/2021 | Reimbursement to Pres. McCamy for sign post from Big Creek Lumber. | $20.00 |
2021 YTD TOTAL: | $14,652.00 |
Contract Date | Description | Amount |
---|---|---|
August/2020 | Mitch Frederick Paving - Ground Squirrel Hollow Road Repair Project, Invoice 080720-02. | $42,290.00 |
August/2020 | Mitch Frederick Paving - Ground Squirrel Hollow Road Repair Project, Invoice 080720-01. | $83,047.00 |
May/2020 | MTM Construction - Drainage improvements at "mud corner" in front of 5661 Ground Squirrel Hollow Road. | $8,873.00 |
2020 YTD TOTAL: | $134,210.00 |
Contract Date | Description | Amount |
---|---|---|
December/2019 | Mitch Fredrick- Forked horn repairs, GHS to new chip seal area | $50,973.00 |
June/2019 | Allen Duckworth (Lowes) -Sign posts and hardware to install curve signs on GSH $41.30 | $41.00 |
May/2019 | Allen Duckworth (Lowes) 6- sign posts and 12 bolts to install Dip signs on Lone Pine, Silverado and Forked Horn $115.66 | $115.00 |
April/2019 | Kevin McCamy (Betschart Contractors) 10- Traffic cones, 2- type barricades with aluminum sign attached $150 | $150.00 |
March/2019 | Pam Fulmer (Tidwell Sign)- 2 street signs and pole brackets, Forked Horn and Prancing Deer $231.66 | $231.00 |
2019 YTD TOTAL: | $51,510.00 |
Contract Date | Description | Amount |
---|---|---|
November/2018 | Mitch Fredrick- Pothole project, Impala | $28,045.00 |
October/2018 | Mitch Fredrick- Pothole project, Gunsmoke, GSH, Silverado, Peppertree and Impala- $72,449.70 | $72,449.00 |
October/2018 | Mitch Fredrick- Pothole project, Gunsmoke, GSH, Silverado and Peppertree- $28,836.24 | $28,836.00 |
September/2018 | Mitch Fredrick- Pothole repair project, Blossom, Mulberry and Impala- $ 38,293.56 | $38,293.00 |
September/2018 | Mitch Fredrick- Pothole repair project, Impala and Playdoe- $22,699.80 | $22,699.00 |
August/2018 | Mitch Fredrick- concrete swale corrosion repairs at 5590 Forked Horn | $3,250.00 |
June/2018 | Extra work per contract dated May 3, 2018. Cleaned chip seal as needed, applied an oil tack coat.Installed 360' lineal feet of asphalt machine berm type "A" dyke on North shoulder of Lone Pine Place from culvert inlet at 5621 to driveway at 5651. 360' lineal foot @ $10.50 per L.F. = $3,780. Extra work per contract dated May 23, 2018 Furnished and installed culvert extension 12" diameter x 7' long at 5760 Lone Pine Pl. to control erosion at the fence line. $300.00 Lone Pine Pl. existing chip seal/asphalt area from 5831 to 5871 and Pepper Tree south end from Lone Pine Place to 2360 Pepper Tree 10,400 sq. ft single chip seal: Cleaned areas as needed, installed and compacted 3 tons of hot mix asphalt skin patching as needed, applied an oil fog seal on all patches. Installed a single chip seal using CRS2H oil applied at a rate of .40 gallons per square yard. Installed and compacted 3/8" granite chips at a rate of 32 lbs per square yard. Furnished traffic control and signage as needed. $ 7,280.00 Total cost $ 11,360.00 | $11,360.00 |
June/2018 | Chip seal project- Completed work per RFP/contract dated January 9, 2018. Cleared and grubbed edges/swales as needed, set drainage. Ripped roads to a 3" depth minimum, added water for proper moisture content. Fine graded, watered, re-compacted existing base and sub-grade as needed to establish 20' widths*, where possible. Installed and compacted class 2 base as noted on sheets 7-13. Set grades for double chip-seal. Paved swales as needed. Installed a double chip-seal: 1st layer applied SC800 oil at .50 gallons per square yard. Installed and compacted 1/2" granite chips at a rate of 30 lbs per square yard. 2nd layer applied CRS2H oil at a rate of .40 gallons per square yard. Installed and compacted 3/8" granite chips at a rate of 32 lbs per square yard. Furnished traffic control and signage as needed. Roads completed, Lone Pine and South Peppertree. Clear, grub, sub grade, base installation and fine grade. 73,610 sq. ft @ $0.56 sq. ft. = $41,221.60 Double Chip-seal. 73,610 sq. ft. @ $0.83 sq. ft. = $ 61,096.30 Class 2 base materials and delivery. 2,383.66 tons @ $ 23.00 per ton = $ 54,824.18 Traffic control and signage. Lump sum (partial) $ 1,500.00 Culvert swale sheet #2. Lump sum $ 7,500.00 *Some areas are 18' and 16' wide. Total cost $ 166,142.08 | $166,142.00 |
June/2018 | Mitch Fredrick- Extra work on Chip Seal project, Phase 3, Lone Pine and south Pepper Tree | $11,360.00 |
June/2018 | Mitch Fredrick- Extra work on Chip Seal project, Phase 3, Lone Pine and south Pepper Tree- $27,640.84 | $27,640.00 |
June/2018 | Statewide Safety Signs- (20) 20 MPH Signs $806.52 | $806.00 |
April/2018 | Chip seal project- Completed work per RFP/contract dated January 9, 2018. Cleared and grubbed edges/swales as needed, set drainage. Ripped roads to a 3" depth minimum, added water for proper moisture content. Fine graded, watered, re-compacted existing base and sub-grade as needed to establish 20' widths*, where possible. Installed and compacted class 2 base as noted on sheets 7-13. Set grades for double chip-seal. Paved swales as needed. Installed a double chip-seal: 1st layer applied SC800 oil at .50 gallons per square yard. Installed and compacted 1/2" granite chips at a rate of 30 lbs per square yard. 2nd layer applied CRS2H oil at a rate of .40 gallons per square yard. Installed and compacted 3/8" granite chips at a rate of 32 lbs per square yard. Furnished traffic control and signage as needed. Roads completed, Whitetail and Morning Star. Clear, grub, sub grade, base installation and fine grade. 92,581 sq. ft @ $0.56 sq. ft. = $51,845.36 Double Chip-seal. 92,851 sq. ft. @ $0.83 sq. ft. = $ 76,842.23 Class 2 base materials and delivery. 2,034.59 tons @ $23.00 per ton = $ 46,795.57 Traffic control and signage. Lump sum (partial) $ 1,500.00 Culvert per proposal 04/05/2018 Lump sum $ 2,375.00 This completes the first half of phase #3. *Some areas are 18' and 16' wide. Total cost $ 179,358.16 | $179,358.00 |
February/2018 | Statewide Safety Signs- Slow Curve, Slow Dip, Deliminators $1903.70 | $1,903.00 |
2018 YTD TOTAL: | $592,141.00 |
Contract Date | Description | Amount |
---|---|---|
December/2017 | Chip Seal Project first 1/2 phase 2- Completed work per RFP/contract dated October 10, 2017. Cleared and grubbed edges/swales as needed, set drainage. Ripped roads to a 3" depth minimum, added water for property moisture content. Fine graded, watered, re-compacted existing base and sub-grade as needed to establish 20' widths. Installed and compacted 4"-6" of class 2 base as needed in various areas. Set grades for double chipseal. Installed a double chipseal: 1st layer applied SC800 oil at .50 gallons per square yard. Installed and compacted 1/2" granite chips at a rate of 30 lbs per square yard. 2nd layer applied CRS2H oil at a rate of .40 gallons per square yard. Installed and compacted 3/8" granite chips at a rate of 32 lbs per square yard. Furnished traffic control and signage as needed. Roads completed: North Peppertree. west end Silverado and Prancing Deer. Clear, grub, subgrade, base installation and final grade. 78,281 sq. ft. @ $ 0.58 sq. ft. = $ 45,402.98 Double chip-seal, 78,281 sq. ft @ $ 0.90 sq. ft. = $ 70,452.90 Class 2 base materials and delivery. 2,507.85 tons @ $24.50 per ton = $ 61,442 Traffic control and signage Lump sum (partial) $ 2,000 Concrete swale sheet #6 Lump Sum $ 7,500 Culvert sheet #9 Lump sum $ 5,900 Culvert sheet # 11 Lump sum $ 4,950 This is just over 1/2 Phase #2 completed. Total cost $ 197,648.21 | $197,648.00 |
November/2017 | Chip Seal Project- Completed work per RFP/contract dated August 9, 2017. Cleared and grubbed edges/swales as needed, set drainage. Ripped roads to a 3" depth minimum, added water for proper moisture content. Fine graded watered, re-compacted existing base and sub-graded as needed to establish 20' widths. Installed and compacted 4"-6" of class 2 base* as needed in various areas. Set grades for double chip-seal. Installed a double chip-seal: 1st layer applied SC800 oil at .50 gallons per square yard. Installed and compacted 1/2" granite chips at a rate of 30 lbs per square yard. 2nd layer applied CRS2H oil at a rate of .40 gallons per square yard. Installed and compacted 3/8" granite chips at a rate of 32 lbs per square yard. Furnished traffic control and signage as needed. Roads completed, Forked Horn west end asphalt to asphalt on East and Winchester. Clear, grub, sub-grade, base installation and fine grade. 49,100 sq. ft. @ $1.44 sq. ft. = $ 70,704.00 Double chip-seal 49,100 sq. ft. @ $ 0.86 sq. ft. = $ 42,226.00 Traffic control and signage. Lump sum (partial) $ 2,500 Concrete swale. Lump sum $ 8,500 Asphalt materials for down drain. 6.0 tons @ $ 100 per ton = $600.00 *This section called for 1,575 tons of class 2 base, only 1,423 tons was needed/used so a credit for unused materials and delivery on 152 tons @ $ 24.00 per ton allowed. Phase #1 is complete. Total due $ 120,882.00 | $120,882.00 |
November/2017 | Associated traffic safety- 2 blank signs $56.25 | $56.00 |
September/2017 | Chip Seal Project- Mitch Fredrick Completed work per RFP/contract dated August 9, 2017. Cleared and grubbed edges/swales as needed, set drainage. Ripped roads to a 3" depth minimum, added water for proper moisture content. Fine graded, watered, re-compacted existing base and sub-grade as needed to establish 20' widths. Installed and compacted *class 2 base as needed in various areas. Set grades for double chipseal. (Blacktail, Buck Way and western end of Forked Horn had 6" of existing base). Installed a double chipseal: 1st layer applied SC800 oil at .50 gallons per square yard. Installed and compacted 1/2" granite chips at a rate of 30 lbs per square yard. 2nd layer applied CRS2H oil at a rate of .40 gallons per square yard. Installed and compacted 3/8" granite chips at a rate of 32 lbs per square yard. Furnished traffic control and signage as needed. Roads completed, Blacktail, Buck Way and Forked Horn west end to asphalt on East. Clear, grub, sub grade, base installation and fine grade.101,300 sq. ft @ $1.44 sq. ft. = $145,872.00 Double Chipseal 101,300 sq. ft. @ $0.84 sq. ft. = $ 87,118.00 Traffic control and signage. Lump sum (partial) $ 3,500.00 *This section called for 2,775 tons of class 2 base, only 820 tons was needed/used so a credit for unused materials and delivery on 1,955 tons @ $24.00 per ton allowed. Total due $189,570.00 | $189,570.00 |
May/2017 | Mark Switzer Excavating- Lower phone lines to install culvert | $775.00 |
May/2017 | Mark Switzer Excavating- Pepper Tree hill paving project | $43,129.00 |
April/2017 | Mitch Fredrick- Silverado, Lone Pine, Prancing Deer- Power wash culverts and rebuild shoulders and compact. | $21,200.00 |
April/2017 | Mitch Fredrick- Forked Horn paving project | $27,263.00 |
April/2017 | Mitch Fredrick- Morningstar emergency repairs | $7,750.00 |
March/2017 | Kritz- Rock stockpile for repairs $241.31 | $241.00 |
February/2017 | MTM- Morning Star 2 culverts | $12,000.00 |
January/2017 | Mitch Fredrick- DG Stockpile for repairs | $475.00 |
2017 YTD TOTAL: | $620,989.00 |
Contract Date | Description | Amount |
---|---|---|
February/2016 | Lone Pine | $850.00 |
February/2016 | Forked Horn | $9,950.00 |
February/2016 | Peppertree/Forked Horn | $1,265.00 |
2016 YTD TOTAL: | $12,065.00 |
Contract Date | Description | Amount |
---|---|---|
October/2015 | Various roads | $12,092.00 |
October/2015 | Peppertree, Silverado | $3,460.00 |
October/2015 | Silverado | $450.00 |
August/2015 | Peppertree Hill | $10,025.00 |
May/2015 | Peppertree | $730.00 |
2015 YTD TOTAL: | $26,757.00 |
Contract Date | Description | Amount |
---|---|---|
April/2014 | Maintenance base roads included 900 tons of Class II base, 80 yards of red rock base; rip, grade, compact set and grade clean. Road work will be furnished on the sections of the following roads. -Between Lone Pine & Geneseo to GSH (address 5820-5831) add 75 tons of subbase. -Silverado from Geneseo to GSH added 400 tons of base throughout the whole road. - Morning Star from GSH to Maverick added 425 tons of subbase throughout the whole road. - Pepper Tree from Geneseo to Prancing Deer. At Pepper Tree Hill (at Silverado 340 ft. N of culvert) add 80 ton of red rock base material. - Prancing Deer from 5714 until end of road. -Winchester from GSH until end of road. - Blacktail entire road. - Buck Way entire road. - Forked Horn from approx 5520 to end of based road as well as between 5695 and top of hill. | $106,087.00 |
February/2014 | Emergency work - Silverado | $350.00 |
February/2014 | Encroachment work | $16,930.00 |
January/2014 | Emergency work - various roads | $2,375.00 |
2014 YTD TOTAL: | $125,742.00 |
Contract Date | Description | Amount |
---|---|---|
August/2013 | Chip Seal White Tail, Prancing Deer, Stagg Hill | $69,247.00 |
March/2013 | Drainage Work - Silverado | $5,740.00 |
January/2013 | Emergency Work - Culverts | $1,500.00 |
2013 YTD TOTAL: | $76,487.00 |
Contract Date | Description | Amount |
---|---|---|
August/2012 | Based Roads - Forked Horn, Buck Way, Black Tail, Morning Star, White Tail, Lone Pine, Silverado, Peppertree, Prancing Deer | $37,572.00 |
March/2012 | Emergency Work - Culverts | $1,100.00 |
March/2012 | Emergency Work - Morning Star | $2,250.00 |
January/2012 | A/C Playdoe from GSH to Maverick, Maverick from Playdoe to White Tail | $43,806.00 |
2012 YTD TOTAL: | $84,728.00 |
Contract Date | Description | Amount |
---|---|---|
August/2011 | Culverts | $5,140.00 |
August/2011 | Based Roads - Morning Star, Lone Pine, Silverado, Forked Horn, Blacktail | $8,900.00 |
August/2011 | A/C Patch of various roads | $22,165.00 |
April/2011 | A/C, Chip, DG | $36,917.00 |
April/2011 | A/C - GSH | $32,765.00 |
March/2011 | Emergency Work - Forked Horn | $2,500.00 |
2011 YTD TOTAL: | $108,387.00 |
Contract Date | Description | Amount |
---|---|---|
August/2010 | Emergency Repairs - Impala & Playdoe | $1,000.00 |
August/2010 | AC Work - Playdoe | $17,480.00 |
August/2010 | AC Work - White Tail | $2,100.00 |
August/2010 | AC Work - Stag Hill | $2,100.00 |
August/2010 | AC Work - Ground Squirrel Hollow | $6,075.00 |
August/2010 | AC Work - Prancing Deer | $2,240.00 |
May/2010 | DG Work - Winchester | $400.00 |
May/2010 | DG Work - Forked Horn | $8,775.00 |
May/2010 | DG Work - Prancing Deer | $7,475.00 |
May/2010 | DG Work - Silverado | $9,350.00 |
May/2010 | DG Work - Lone Pine | $9,175.00 |
May/2010 | DG Work - Morning Star | $8,775.00 |
May/2010 | DG Work - Black Tail | $2,750.00 |
May/2010 | DG Work - Buck Way | $1,750.00 |
May/2010 | DG Work - White Tail Place & Pepper Tree | $8,450.00 |
March/2010 | DG Work - Stag Hill | $525.00 |
January/2010 | Emergency Work - DG Stockpile | $425.00 |
2010 YTD TOTAL: | $88,845.00 |
Contract Date | Description | Amount |
---|---|---|
December/2009 | Emergency Road Repairs - Silverado Place | $3,500.00 |
May/2009 | Various Road Repairs - Ground Squirrel Hollow Road - Reach #2 | $16,429.00 |
May/2009 | Various Road Repairs - Ground Squirrel Hollow Road - Reach #1 | $22,386.00 |
May/2009 | Various Road Repairs - Mulberry Lane | $23,741.00 |
May/2009 | Various Road Repairs - Blossom Lane | $8,798.00 |
February/2009 | Emergency Road Repairs - Forked Horn | $12,333.00 |
2009 YTD TOTAL: | $87,187.00 |
Contract Date | Description | Amount |
---|---|---|
July/2008 | Various Road Repairs - Lone Pine Road | $4,987.00 |
May/2008 | Various Road Repairs - Clean up base on Peppertree from Prancing Deer to Geneseo. Rip, water, grade and re-compact. From 2190 Peppertree - up hill (North), add 25 tons of sub-base. | $4,425.00 |
May/2008 | Various Road Repairs - Clean up base on Silverado. From Geneseo to GSH, Rip, water, grade and re-compact with roller. Clean shoulder for proper drainage. From 5851 to 5828 Silverado add 25 tons of sub-base. At 5660 add another 25 tons of sub-base. Grade water and compact. | $10,010.00 |
March/2008 | Various Road Repairs - Clean up base on Lone Pine from Geneseo to GSH. Rip, water, grade and re-compact with roller. Clean up shoulder for proper drainage. From Geneseo to Peppertree, add 12 tons of sub-base. From Peppertree to 5691 Lone Pine, add 363 tons of sub-base. From 5660 Lone Pine to GSH add 25 tons of sub-base. | $17,040.00 |
March/2008 | Various Road Repairs - Clean up base on Morning Star from GSH to Maverick. Rip, water, grade and re-compact with roller. Clean up shoulder for proper drainage. From GSH to 5531 Morning Star, add 50 tons of sub-base. From 5531 to 5350 Morning Star, add 150 tons of sub-base. | $11,560.00 |
March/2008 | Various Road Repairs - Clean up base on Prancing Deer from pavement end to end. Rip, water, grade and re-compact with roller. From pavement end to the bottom of the hill at Peppertree, add 200 tons of sub-base. From Peppertree to end of Prancing Deer, add 50 tons of sub-base where needed. | $11,350.00 |
March/2008 | Various Road Repairs - From 5525 Forked Horn to West 5850 Forked Horn - Rip, water, and re-compact with roller. Clean the shoulder for proper drainage. Add 150 tons of sub-base where it is needed. | $9,160.00 |
2008 YTD TOTAL: | $68,532.00 |
Contract Date | Description | Amount |
---|---|---|
January/2007 | Various Road Repairs - Playdoe Road from Ground Squirrel Hollow to Maverick Road - Sweep/Clean road surfaces and potholes as needed, apply an oil tack coat on areas to be patched, install/compact hot mix asphalt (Approx 5 tons). | $2,260.00 |
January/2007 | Various Road Repairs - Ground Squirrel Hollow from Playdoe Road to Forked Horn - Sweep/Clean road surfaces and potholes as needed, apply an oil tack coat on areas to be patched, install/compact hot mix asphalt (Approx 15 tons) | $4,050.00 |
January/2007 | Various Road Repairs - Ground Squirrel Hollow from Geneseo Road to Playdoe Road - Sweep/Clean road surfaces and potholes as needed, apply an oil tack coat on areas to be patched, install/compact hot mix asphalt (Approx 100 tons). | $14,100.00 |
January/2007 | Emergency Road Repair - Pepper Tree Way - Base Work 3,200 sq. ft. (400 x 8) - Furnish/deliver and install/compact 6 inches of Windsor Red Rock base material 8 foot wide from Silverado Road to bottom of hill. | $3,850.00 |
January/2007 | Emergency Road Repair - Pepper Tree Way - Base Work 4,800 sq. ft. (400 x 12)- Furnish/deliver and install/compact 6 inches of Windsor Red Rock base material 12 foot wide from Silverado Road to bottom of hill. | $6,575.00 |
January/2007 | Emergency Road Repair - Pepper Tree Way - Sub Grade Work - Cut sub grade on road surface to establish proper drainage, cut/fill road surface to establish a 20 foot width with drainage swales down each side (dependent on phone line placement), set grades for placement of 6 inches of Windsor Red Rock base material. | $3,400.00 |
2007 YTD TOTAL: | $34,235.00 |
Contract Date | Description | Amount |
---|---|---|
December/2006 | Morningstar - From Ground Squirrel Hollow to 5350 Morningstar - Clean up shoulder, crown, and slope where needed for proper drainage, add approx 1,450 tons of Rocky Canyon sub-base (approx 4"), and water/compact | $0.00 |
December/2006 | 5673-5680 Forked Horn - Remove debris form plugged culvert, furnish and install 40 feet of new 18' culvert, add approx 50 tons Rocky Canyon sub-base to cover culvert and correct drainage. | $0.00 |
December/2006 | Pepper Tree - Clean up base from Silverado to Lone Pine, cut in shoulder, add approx 400 tons of Rocky Canyon sub-base (approx 4"), and water/compact | $0.00 |
October/2006 | White Tail Place - Rip/Water/Re-compact, add approx 130 tons of Class II base, recrown, re-compact w/roller, clean up shoulders from top of hill to 30' past pole. | $7,000.00 |
October/2006 | 5671-5660 Lone Pine - 280'x21' of road from block wall to bottom of hill- Remove existing A/C, re-grade and sheet to the right side - looking up the hill, pave 2 1/2" compacted - 3/4" aggregate, burm on right side from top of hill to driveway, pave swell across approach, backfill and compact shoulder (approx 90 tons A/C and approx 129 tons base at 4" thick) | $20,490.00 |
October/2006 | GSH from Forked Horn to Gunsmoke - Sweep/Blow/Clean 18'x920' road, clean up shoulders on both sides, Sweep/Clean/Tack oil/Skin Patch (approx 75 tons of A/C 3/8" aggregate). | $10,974.00 |
October/2006 | Gunsmoke/GSH - Sweep/Clean/Tack oil/Skin Patch 3/8" aggregate on GSH to Power Pole (approx 20tons of A/C), clean up right shoulder going up hill and use dirt on left side to fill in trench, water and compact. | $4,480.00 |
October/2006 | 6005 Silverado - 20'x400' of approx 176 tons Class II base (approx 4") positive flow across road at corner, clean up shoulder. | $7,765.00 |
October/2006 | 5825 Silverado - Furnish & Install one 18" diameter x 25' long steel culvert pipe, install & compact 75 tons of Class II base, install rip rap rock over culvert at inlet/outlet. | $4,795.00 |
April/2006 | Various - Asphalt Repairs to potholes and extreme broken edges, cleana areas to be patched, install/compact 15 tons of 3/8" hot mix asphalt patching. | $3,825.00 |
January/2006 | Impala to end of road - Sweep/Clean/Tack Oil Thin Skim hot patch 3/8" aggregate, Play Doe to top of hill 18/tons, to top of ridge 25/tons | $7,720.00 |
January/2006 | Stagg Hill to end of pavement - Sweep/Clean/Tack Oil asphalt patch | $675.00 |
January/2006 | Maverick from White Tail to end of pavement - Sweep/Clean/Tack Oil asphalt patch | $675.00 |
January/2006 | Play Doe to Maverick - Sweep/Clean/Tack Oil asphalt patch | $475.00 |
January/2006 | Prancing Deer to end of pavement - Sweep/Clean/Tack Oil asphalt patch | $2,250.00 |
2006 YTD TOTAL: | $71,124.00 |
Contract Date | Description | Amount |
---|---|---|
December/2005 | Ground Squirel Hollow from Prancing Deer to Forked Horn - Sweep/Clean/Tack Oil asphalt patch, approx 12 points | $925.00 |
December/2005 | Ground Squirel Hollow from Lone Pine to Prancing Deer - Sweep/Clean/Tack Oil asphalt patch, approx 28 points | $1,750.00 |
December/2005 | Ground Squirel Hollow to Lone Pine - Sweep/Clean/Tack Oil asphalt patch, approx 18 points | $1,325.00 |
December/2005 | Siverado at Geneseo - Grade/ Shape/ Add 100 tons of DG base material, as needed. | $5,755.00 |
October/2005 | Lone Pine - Grade/ Shape/ Add 100 tons of DG base material to Lone Pine,beginning at Ground Squirrel Hollow, transition from asphalt to 5660 Lone Pine ,and from 5671 Lone Pine to 5960 Lone Pine | $11,493.00 |
August/2005 | Forked Horn from Ground Squirrel Hollow to top of hill -Sweep / Clean / Tack Oil / Asphalt Patch 22 tons. | $4,800.00 |
August/2005 | Maverick from Play Doe to White Tail - Sweep / Clean / Tack Oil / Asphalt Patch 5 tons on Maverick. | $1,150.00 |
August/2005 | Play Doe from Ground Squirrel Hollow to Maverick - Sweep / Clean / Tack Oil /Asphalt Patch 17 tons. | $4,250.00 |
August/2005 | Ground Squirrel Hollow from Play Doe to Geneseo - Sweep / Clean / Tack Oil / Asphalt Patch 10 tons (holes only not edges). | $3,150.00 |
August/2005 | Ground Squirrel Hollow from Forked Horn to Play Doe - Sweep / Clean / Tack Oil / Asphalt Patch 12 tons. | $2,450.00 |
March/2005 | Ground Squirrel Hollow from Geneseo to Silverado - Grade road edges to remove overburden material, power sweep and clean road surface, apply an oil tack coat where needed, install/compact 125 tons of "hot" mix asphalt patching to pot hole and road edges out to a maximum width of 18 feet. | $13,950.00 |
February/2005 | Pepper Tree - Grade existing road (to improve drainage), install approx 100 tons DG base, compact. | $3,440.00 |
February/2005 | Silverado - Remove existing culvert, furnish/install 2 - 18" diameter x 25' HDPE culvert pipes, repair road, install approx 25 tons of DG, furnish/install 2 - 18" diameter x 20' culvert pipes at driveway. | $2,950.00 |
February/2005 | Forked Horn - Grade road from chipseal section to end (to improve drainage) ,install approx 200 tons of DG base on hill slopes as necessary, compact. | $6,280.00 |
2005 YTD TOTAL: | $63,668.00 |
Summary | Amount |
---|---|
2024 |
$188,790.00 |
2023 |
$41,506.00 |
2022 |
$124,380.00 |
2021 |
$14,652.00 |
2020 |
$134,210.00 |
2019 |
$51,510.00 |
2018 |
$592,141.00 |
2017 |
$620,989.00 |
2016 |
$12,065.00 |
2015 |
$26,757.00 |
2014 |
$125,742.00 |
2013 |
$76,487.00 |
2012 |
$84,728.00 |
2011 |
$108,387.00 |
2010 |
$88,845.00 |
2009 |
$87,187.00 |
2008 |
$68,532.00 |
2007 |
$34,235.00 |
2006 |
$71,124.00 |
2005 |
$63,668.00 |
Grand Total | $2,615,935.00 |