November/2018 |
Mitch Fredrick- Pothole project, Impala |
$28,045.00 |
October/2018 |
Mitch Fredrick- Pothole project, Gunsmoke, GSH, Silverado, Peppertree and Impala- $72,449.70 |
$72,449.00 |
October/2018 |
Mitch Fredrick- Pothole project, Gunsmoke, GSH, Silverado and Peppertree- $28,836.24 |
$28,836.00 |
September/2018 |
Mitch Fredrick- Pothole repair project, Blossom, Mulberry and Impala- $ 38,293.56 |
$38,293.00 |
September/2018 |
Mitch Fredrick- Pothole repair project, Impala and Playdoe- $22,699.80 |
$22,699.00 |
August/2018 |
Mitch Fredrick- concrete swale corrosion repairs at 5590 Forked Horn |
$3,250.00 |
June/2018 |
Extra work per contract dated May 3, 2018.
Cleaned chip seal as needed, applied an oil tack coat.Installed 360' lineal feet of asphalt machine berm type "A" dyke on North shoulder of Lone Pine Place from culvert inlet at 5621 to driveway at 5651.
360' lineal foot @ $10.50 per L.F. = $3,780.
Extra work per contract dated May 23, 2018
Furnished and installed culvert extension 12" diameter x 7' long at 5760 Lone Pine Pl. to control erosion at the fence line. $300.00
Lone Pine Pl. existing chip seal/asphalt area from 5831 to 5871 and Pepper Tree south end from Lone Pine Place to 2360 Pepper Tree 10,400 sq. ft single chip seal: Cleaned areas as needed, installed and compacted 3 tons of hot mix asphalt skin patching as needed, applied an oil fog seal on all patches.
Installed a single chip seal using CRS2H oil applied at a rate of .40 gallons per square yard. Installed and compacted 3/8" granite chips at a rate of 32 lbs per square yard. Furnished traffic control and signage as needed. $ 7,280.00
Total cost $ 11,360.00 |
$11,360.00 |
June/2018 |
Chip seal project- Completed work per RFP/contract dated January 9, 2018. Cleared and grubbed edges/swales as needed, set drainage. Ripped roads to a 3" depth minimum, added water for proper moisture content. Fine graded, watered, re-compacted existing base and sub-grade as needed to establish 20' widths*, where possible. Installed and compacted class 2 base as noted on sheets 7-13. Set grades for double chip-seal. Paved swales as needed. Installed a double chip-seal: 1st layer applied SC800 oil at .50 gallons per square yard. Installed and compacted 1/2" granite chips at a rate of 30 lbs per square yard. 2nd layer applied CRS2H oil at a rate of .40 gallons per square yard. Installed and compacted 3/8" granite chips at a rate of 32 lbs per square yard. Furnished traffic control and signage as needed.
Roads completed, Lone Pine and South Peppertree.
Clear, grub, sub grade, base installation and fine grade. 73,610 sq. ft @ $0.56 sq. ft. = $41,221.60
Double Chip-seal. 73,610 sq. ft. @ $0.83 sq. ft. = $ 61,096.30
Class 2 base materials and delivery. 2,383.66 tons @ $ 23.00 per ton = $ 54,824.18
Traffic control and signage. Lump sum (partial) $ 1,500.00
Culvert swale sheet #2. Lump sum $ 7,500.00
*Some areas are 18' and 16' wide.
Total cost $ 166,142.08 |
$166,142.00 |
June/2018 |
Mitch Fredrick- Extra work on Chip Seal project, Phase 3, Lone Pine and south Pepper Tree |
$11,360.00 |
June/2018 |
Mitch Fredrick- Extra work on Chip Seal project, Phase 3, Lone Pine and south Pepper Tree- $27,640.84 |
$27,640.00 |
June/2018 |
Statewide Safety Signs- (20) 20 MPH Signs $806.52 |
$806.00 |
April/2018 |
Chip seal project- Completed work per RFP/contract dated January 9, 2018.
Cleared and grubbed edges/swales as needed, set drainage. Ripped roads to a 3" depth minimum, added water for proper moisture content. Fine graded, watered, re-compacted existing base and sub-grade as needed to establish 20' widths*, where possible.
Installed and compacted class 2 base as noted on sheets 7-13. Set grades for double chip-seal. Paved swales as needed. Installed a double chip-seal: 1st layer applied SC800 oil at .50 gallons per square yard. Installed and compacted 1/2" granite chips at a rate of 30 lbs per square yard. 2nd layer applied CRS2H oil at a rate of .40 gallons per square yard. Installed and compacted 3/8" granite chips at a rate of 32 lbs per square yard. Furnished traffic control and signage as needed.
Roads completed, Whitetail and Morning Star.
Clear, grub, sub grade, base installation and fine grade. 92,581 sq. ft @ $0.56 sq. ft. = $51,845.36
Double Chip-seal. 92,851 sq. ft. @ $0.83 sq. ft. = $ 76,842.23
Class 2 base materials and delivery. 2,034.59 tons @ $23.00 per ton = $ 46,795.57
Traffic control and signage. Lump sum (partial) $ 1,500.00
Culvert per proposal 04/05/2018 Lump sum $ 2,375.00
This completes the first half of phase #3.
*Some areas are 18' and 16' wide.
Total cost $ 179,358.16 |
$179,358.00 |
February/2018 |
Statewide Safety Signs- Slow Curve, Slow Dip, Deliminators $1903.70 |
$1,903.00 |